On the Job: Work in Progress

Work in progress: marble-look herringbone floor tile being set over an orange tile membrane.
Work in progress: marble-look herringbone floor tile being set over an orange tile membrane.

01 / The project

A little context. A clearer picture.

A look at projects mid-build: tile set over membranes, showers waterproofed before tile, heated floors laid, kitchens and built-ins framed and installed, basements framed and drywalled, and decks built and stained — plus a couple of the tools behind the work.

Type of work
Work in progress
Scope
Visible details: tile membranes and shower waterproofing, floor heating, mosaic and large-format tile setting, kitchen island and cabinet installation, built-in bench framing, basement framing and drywall finishing, stair and deck work, and tile and miter saws.